Step one.  The tank base – plates are positioned on the geared up foundation and welded jointly.
Action 2.  The beams or lattice function of the roof are assembled and ultimately joined to the upper rim of the shell ring.
Action 3.  The jacking equipment is installed in the tank. The plates of the second shell ring (following to the prime ring) are positioned outside the initial one.
Step4.   The finished part of the tank (roof and prime shell ring) is lifted hydraulically to a top at which the plates of the second ring can be moved into area and the roof sheeting can be completed.
Step5.   The plates of the 2nd shell ring are situated specifically and welded collectively to the reduce edge of the very first ring.
Step6.   The plates of the third shell ring are positioned outside the 2nd shell ring.
Step7.   The completed element of the tank (roof the two uppermost shell rings) is lifted.
Step8.   The earlier mentioned cycle of functions is recurring right up until the final (base) shell ring is completed.
Step9.    The whole tank is decreased down to the base plate and welded to this.
Step10.  The lifting equipment is dismantled.