45m3 Hr Concrete Pump with 21m Placing Boom Without Truck

45m3 Hr Concrete Pump with 21m Placing Boom Without Truck

45m3/hr concrete pump with 21m putting growth with no truck 
New design trailer mobile diesel pump with 21m putting boom

Trailer Concrete Pump Growth is combined with high trustworthiness, economy, basic safety and durability. It has reasonable collocations for power system, control system, hydraulic technique and pumping technique. With the attributes of adaptable foldable arms, small room occupying assist legs, very easily movable positive aspects, geared up with H/L pressure change, substantial outlet strain, the entire concrete pump boom is far more flexible, dependable, steady and risk-free. It is the top-option concrete equipment extensively used in tunnel, airport, seaport, higher-speed rail internet site, beam discipline, bridge design assignments and so on.

one.Adopted self-produced chassis, no want the quantity plate. It is the non-normal machine with less complicated marketing and advertising process and without having high import tariff.

two.The chassis can be hydraulic driven, velocity alter, change and steering by the hydraulic motor, gearbox and oil cylinder, and also can be pushed by motor tractor.

3.Via finite element examination, dynamics investigation, calculation and experiment, on the foundation of accurate data support, adopted large strength lower alloy metal plate,  all components and welds move 100% NDT. Make certain the rationality and trustworthiness of the X-variety brace and arm construction.

4.The motor velocity is controlled routinely, when the arms relocating the rev is 1100-1200rpm, when pumping, the rev alterations with the displacement between 1200-1700rpm, reduced rev with reduced displacement while higher rev with large displacement. The motor torque is the greatest throughout this rev assortment, so that the gasoline is cost-effective and successful.

five.Twin synchronous lubricating program. when working, the swing valve handle oil travel, when not working, can push the rocker manual lubrication. Circulation port can be a bearing dimensions hopper seat lubrication, synchronization can be sent to the piston pump, the piston’s lifestyle enhanced to earlier mentioned thirty thousand cu meters.

six.The arm frame adopts the load sensing proportional multi way valve, the motion pace is stepless regulation, the velocity is effortless, the procedure overall performance is superb. Not only can understand the remote handle, but also can comprehend the emergency guide operation. Mixing and supporting legs by the equipment pump oil, with the pressure relay can accomplish computerized mixing and reverse, to avoid large stones trapped blade.

 

Design KNL5190THB
Merchandise Device Parameter
Pumping Method Max. Theoretical Output m3/h 45
(/)
Max. Theoretical Concrete Output Pressure (H/L Pressure)
MPa 8/five
Rated Working Force MPa 32
Pumping Frequency min-1 seventeen
Hopper Potential L 600
Filling Peak mm 1400
CZPT System Sort   Open Loop
Distribution valve   S
S valve
×
Oil Cylinder Diameter × Stroke
mm Φ100×1400
×
Concrete Cylinder Diameter × Stroke
mm φ230×1400
CZPT Oil Cooling   Air cooling
Recommended Concrete Slump cm twelve~23
Max. Permitted Mixture Dimension mm 40
Putting Increase Structure Kind   21-3R
Inserting Top m 21
Placing Horizontal Length m 17
Putting Depth m 10.6
Slewing Angle   ±270°
Pipe Diameter mm 125
Conclude Hose Length mm 3000
Min. Height Of Opening Positioning Boom mm 7000
(××)
Outriggers Span (CZPT × Rear × Side)
mm 3840×3200×5200
Chassis And The Whole Device Chassis Design   CZPTyol CZPT
Wheelbase mm 4700
Engine Type   4ETA3.9-C130-
Motor Electricity kW 97kw
Oil Tank Volume L 115
Tail gas exhaust normal   GUO II
(××)
All round Dimensions (L x W x H)
mm 10540x2320x3570
Other folks Lubrication Method   Guide & CZPT
Oil Tank Quantity L 500
Manage Manner   +
Manual+Distant Handle
Maximum H2o Tank Stress MPa .eight
Water Tank Volume L 400
Pipe Cleansing Manner   /
H2o/Dry Cleaning
Whole 80    

CZPT Machinery is a company specializing in the analysis, design and manufacturing of development machinery for practically twenty many years. We offer the most reasonable remedy according to the unique demand from customers from diverse clients. Our principal items for development equipment are as follows: Concrete mixer, concrete batching plant, diesel concrete mixer, concrete pump, sand so on. With several exploring and producing bases in CZPT, we can provide the powerful technical provider and higher good quality equipment for the consumers all over the entire world. 

We get care of your order! 

one. Best company in North CZPT. 

two. A factory with in excess of twenty years’ encounter. 

three. Skilled teamwork of each and every procedure. 

four. Competitive value and best top quality. 

5. Efficient right after-sale services. 

CZPT Equipment Responses: 

one. Why should I choose your Trailer Concrete Pump? / Putting Increase/Placer
We are a professional manufacturer of Trailer Concrete Pump for thirteen a long time, In our nation, we attended several national assignments and the customers are satisfied with our good quality. All these can meet up with your requirements. So I think our merchandise is your best decision. 

two. Do you have CE certification and do you have ISO9001: 2008 certification? 
Indeed, all our Trailer Concrete Pump are CE qualified and our generation procedure has passed the ISO9001: 2008 requirements. 

3. Which country have you exported to? 
CZPT Trailer Concrete Pump have exported our merchandise to Algeria, Indonesia, Russia, Kazakhstan, Kyrgyzstan and Turkey etc. 

4. What about the Truck Concrete Growth Pump/ Inserting Growth/Placer delivery time? 
CZPTly, the producing time is about fifteen-thirty times. The transportation time is distinct in accordance to your area. 

5. What about the right after-sale service and product warranty. 
We will dispatch our engineers to your place to assist you with the set up of Trailer Concrete Pump and instruction your staff. The guarantee time is twelve month right after it created. 

six. What about the price of Truck Concrete Increase Pump/ Putting Increase/Placer
We promise to give you the most favorable price to establish a long-time period get-earn cooperation with you. 

7. What payment method can you acknowledge? 
CZPTly, T/T or a hundred% LC at sight is the best for us. 

eight. Can we be your agent in our place? 
Of course, no issues for our Trailer Concrete Pump. 

Right after-sale Service
1. Might get pleasure from the lifestyle-long service following you buy our items. 
two. Education the operator for free of charge. 
3. Beneath the problem that basis, water supply, electricity resource, combination, web hosting
CZPT, auxiliary workers is prepared. Engineers are offered if you want. 
four. Specific quantity stochastic tool will be provided whilst delivering merchandise. 
5. In 48 several hours provider will be available in accordance to different areas soon after obtained
The phone. 
six. For exported products, Our firm sends the constructor to aid to function and
Management tools, time according to your requirements. The connected fee will be undertaken
By buyers. 
7. Promptly supplies the fittings according to users’ calls for, handles for the user consigns
For shipment. 
8. All merchandise (simple worn parts not integrated) reduction induced by non-human elements will be
Free of charge of charge for 50 percent a year. 
nine. Provides the engineering advisory support as essential. 
ten. You should make contact with me by means of telephone when you have any troubles with the plant. 

Dear Friends: 

Welcome to our internet site and hope our trailer concrete pump/Placing Boom / Concerete Placer will make you pleased. We believe creatively, layout bravely, manufacture precisely and loyalty to our buyers. And we have our very own manufacturing unit. So We can create the merchandise, according to consumer specifications. 

Enjoy CZPT Machinery Get pleasure from Far better Lifestyle! 

Yours sincerely
CZPTyol CZPT Equipment

45m3 Hr Concrete Pump with 21m Placing Boom Without Truck